I'm curious.. although I know the answer will be no..

Has anyone had past experiences with Mattamy in terms of them doing tweaks/modifications based on your feedback during the framewalk? (i.e: adding double doors, removing framing for a potential wall, etc)

_________________
Original Closing: Sept 6, 2015
First Delay: Jan 6, 2016
Firm Date: March 3, 2016


Top
 Profile  
Reply with quote  
PostPosted: Wed Dec 16, 2015 3:14 pm 
Offline
User avatar

Joined: Mon Apr 21, 2014 4:28 pm
Posts: 339
I highly doubt it as I was not able to make any amendments to an upgrade option 11 months prior to closing.

_________________
HSV Phase 2
Dundas Model - English Manor
April 21, 2015 Closing Date
Connaught Terrace


Top
 Profile  
Reply with quote  
PostPosted: Wed Dec 16, 2015 4:50 pm 
Offline

Joined: Mon Jul 07, 2008 11:55 am
Posts: 5629
Yep no... it won't happen. Sorry


Top
 Profile  
Reply with quote  
PostPosted: Wed Dec 30, 2015 12:14 pm 
Offline

Joined: Tue May 12, 2015 8:13 am
Posts: 31
can you ask to change the single switch to 3 way switch? I totally forgot about this :(


Top
 Profile  
Reply with quote  
PostPosted: Thu Dec 31, 2015 9:13 am 
Offline

Joined: Mon Jul 23, 2012 11:21 am
Posts: 319
things that will add cost will not happen. if there is an issue, they can fix it. example, if you wanted a phone jack to be located in another part of the bedroom, they may possibly move it. if a light fixture isn't in the correct location, they can move it. adding a switch means more materials which means more money, they won't be able to do anything about that.
i've had them move a door back once for a bedroom as it didn't match up with the floor plan. their mistake. i've had them remove some bulk heads which weren't supposed to be there, move light switches higher as a railing was covering it and had them redo the framing for a closet.


Top
 Profile  
Reply with quote  
PostPosted: Thu Dec 31, 2015 10:30 am 
Offline

Joined: Tue May 12, 2015 8:13 am
Posts: 31
King Luis wrote:
things that will add cost will not happen. if there is an issue, they can fix it. example, if you wanted a phone jack to be located in another part of the bedroom, they may possibly move it. if a light fixture isn't in the correct location, they can move it. adding a switch means more materials which means more money, they won't be able to do anything about that.
i've had them move a door back once for a bedroom as it didn't match up with the floor plan. their mistake. i've had them remove some bulk heads which weren't supposed to be there, move light switches higher as a railing was covering it and had them redo the framing for a closet.


Thanks, King Luis!

Is it too much work to do after closing?


Top
 Profile  
Reply with quote  
PostPosted: Tue Jan 05, 2016 11:48 am 
Offline

Joined: Mon Jul 23, 2012 11:21 am
Posts: 319
crazy8 wrote:
King Luis wrote:
things that will add cost will not happen. if there is an issue, they can fix it. example, if you wanted a phone jack to be located in another part of the bedroom, they may possibly move it. if a light fixture isn't in the correct location, they can move it. adding a switch means more materials which means more money, they won't be able to do anything about that.
i've had them move a door back once for a bedroom as it didn't match up with the floor plan. their mistake. i've had them remove some bulk heads which weren't supposed to be there, move light switches higher as a railing was covering it and had them redo the framing for a closet.


Thanks, King Luis!

Is it too much work to do after closing?


what are you looking to do? anything after closing would probably have to be done by a contractor. i'm sure it's not too hard to go talk to one of the guys already working on other houses and see if they want to do a side job.


Top
 Profile  
Reply with quote  
PostPosted: Tue Jan 05, 2016 10:31 pm 
Offline

Joined: Tue May 12, 2015 8:13 am
Posts: 31
King Luis wrote:
crazy8 wrote:
King Luis wrote:
things that will add cost will not happen. if there is an issue, they can fix it. example, if you wanted a phone jack to be located in another part of the bedroom, they may possibly move it. if a light fixture isn't in the correct location, they can move it. adding a switch means more materials which means more money, they won't be able to do anything about that.
i've had them move a door back once for a bedroom as it didn't match up with the floor plan. their mistake. i've had them remove some bulk heads which weren't supposed to be there, move light switches higher as a railing was covering it and had them redo the framing for a closet.


Thanks, King Luis!

Is it too much work to do after closing?


what are you looking to do? anything after closing would probably have to be done by a contractor. i'm sure it's not too hard to go talk to one of the guys already working on other houses and see if they want to do a side job.


3 way switch from main floor to upstairs by the stairs. I should be able to turn on the lights from main then turn it off from upstairs main hall.


Top
 Profile  
Reply with quote  
PostPosted: Wed Jan 06, 2016 7:12 pm 
Offline

Joined: Sun Mar 16, 2014 7:11 pm
Posts: 142
you will get a 3way from the main to the upstairs...we did and didn't pay extra for it.

_________________
Image
[/url]

Renfrew Elevation "G" Hawthorne Village


Top
 Profile  
Reply with quote  
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 9 posts ] 

All times are UTC - 5 hours


Who is online

Users browsing this forum: No registered users and 1 guest


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
Powered by phpBB® Forum Software © phpBB Group
[ Time : 0.076s | 13 Queries | GZIP : Off ]