erum wrote:
Hi gbharj,
Good to hear from you. Our DC appointment is Oct. 18. What architect options you went with. Our is alternate kitchen and Rec room ready.
We are contemplating whether to get the staircase hardwood or leave it carpeted and taking knee-wall out. What options are you looking to do?
Mattamy quoted for hardwood in oak with kneewall out and stained around 4K, wondering if this makes sense to go with the builder now or do it after closing?
We went with rec room and didn't choose the Alternate layout. I will add the island later after the closing
We are thinking of the following
- Hardwood Stairs (Oak)
- Upgrade carpet to 40 oz and may be 1/2" underpad
- Laminate on the upper level (Hallway)
- Smooth ceiling on main level
- Extra lights with switches (2-3)
- additional 3 way switch on upper hall
- cultured marble on Main and master washroom( may be upgraded faucets, not sure)
- Double sink in Master
- Ceiling tiles above shower (Horizontal layout)
- Add few USB plugs
- About the Kitchen package, so far we are thinking Grande Layout.
- Gas Line for Kitchen appliance
- Whole house humidifier (May be)
The knee wall length is minimal, so removing and getting pickets will not make a difference for us.
so far this is the list ...Which options are you guys thinking ....